Top

Renovation, extension and equipment of the University Hospital of Kinshasa

DRC

Project

The project concerns the renovation, extension and equipment of the University Hospital Centre of Kinshasa.

The existing establishment has a total capacity of approximately 426 beds, with a total built-up area of 34,011 m², built on a 6.4 Ha plot of land.

The existing buildings will be redeveloped. An extension of 6000m² is planned.

There are ten medical departments:

  1. The Anaesthesia-Resuscitation Department
  2. The Department of Medical Biology
  3. The Surgery Department
  4. The Department of Gynaecology and Obstetrics
  5. The Department of Paediatrics
  6. The Department of Internal Medicine
  7. The Department of Odonto-Stomatology
  8. The Specialities Department
  9. The Department of Physical Medicine and Rehabilitation
  10. The Department of Tropical Medicine and Infectious and Parasitic Diseases

Our mission

  • Technical inventory
  • Preliminary Design
  • Detailed design and Tender Documents for biomedical works and equipment
  • Permanent monitoring and control of renovation and extension works