Project
The project concerns the construction of a new railway line between Dosso and Niamey, for passengers and freight. This line is part of the sub-regional railway loop Cotonou-Niamey-Ouagadougou-Abidjan. It is a one-lane railway line with a standard track width, over a total length of 147 km.
Our mission
- Preliminary design.
- Environmental and social impact study.
- Detailed design and elaboration of the tender documents for the works.