Project
The project includes:
- The construction or rehabilitation of 10 dams composed of either a concrete threshold, or an earth dike associated with a gabion spillway;
- The development of 416 ha of irrigated perimeters downstream the dams, including:
- The clearing and the leveling of the areas to develop;
- Building a network of secondary canals paved with concrete, and tertiary earth canals;
- The construction of a network of secondary and tertiary drains;
- The construction and equipment of flow control and diverter structures;
- The provision of motor pumps;
- The construction of a track network;
- The construction of 10 access tracks, with a total length of 46 km.
Our mission
Control and supervision of works.