Project
The project comprises the construction of the following substations :
- Mission 1: Rwabusoro 220/30 KV substation including a control room and staff accommodations
- Mission 2: the 220 KV Mamba substation including a control room and staff accommodations
- Mission 3: Rilima 220/110 KV substation including a control room
Our mission
Architectural and technical design, Implementation design of civil engineering works :
- Earthworks
- Construction of the infrastructure (footings, buried network, earth beams, paving, retaining walls, gutters, etc.)
- Execution of superstructure works including structural work and finishing work
- Production of special lots such as fluids (sanitary plumbing, air conditioning, air treatment, fire detection and protection), electricity (high and low voltage), roads and various networks.