The project concerns the extension of the Apron and related taxiways:

  • parking position for wide-body airplanes (NOSE IN Station)
    • six parking positions B 737-800
      Length = 250m; Depth = 85m (20 000m²)
      Upgrading the taxiway alpha for the reference aircraft B737-800
    • two parking positions B747-400
      Length = 230m; Depth = 112m (25 760 m²)
      Construction of a new taxiway with the width of 23m for the reference aircraft B747-400 aircraft (asphalt concrete pavement)
  • General Aviation Apron
    • The construction of the aviation parking: 160m x 33.5m (5360 m²)
    • The construction of a taxiway to threshold 05 of 10.5m width in asphalt concrete
    • Miscellaneous facilities

Our mission

  • Assistance to the Contracting Authority for the control and supervision of the studies and works.