Top

Maghreb highway Oued Zarga-Bousalem link

Tunisia

Project

The Oued Zarga-Bou Salem highway link, with a length of 70 km (excluding the Beja and Bou Salem ramps), is part of the East-West axis of the motorway scheme adopted for the economic and social development plan in Tunisia. This highway link is part of the trans-Maghreb link that will eventually connect Libya, Tunisia, Algeria and Morocco. The road chosen for the project crosses a mainly mountainous area.

  • The project includes 3 major interchanges and their access ramps (2x2 lanes), with a total length of 9km.
  • The highway section includes 20 reinforced concrete bridges with an average length of 60ml, as well as their access roads (approximately 700ml per structure)
  • The hydraulic structures are 72 in number and are designed for a 100-year return flood frequency. Four large hydraulic structures (GOH), all founded on piles, crossing a major flow are mentioned:
  • GOH 16: Oued Zarga: Bridge with beams of 4 spans of 20m (80ml)
  • GOH 37 :Oued Bou Aouina: Bridge with 3 spans of 20m (60ml)
  • GOH 39:Oued Béja: Bridge with 4 spans of 20m (80ml)
  • GOH 75: Oued Kasseb: 4-span 20m (80ml) girder bridge
  • The typical cross-section of the highway comprises
  • two carriageways, each 7m wide
  • two 3m wide hard shoulder lanes (BAU)
  • a central reservation (TPC) of 12m width: including two left-turn lanes (BDG) of 1m width each and a median lane of 10m width;
  • a berm on the outer side 1m wide;
  • a 0.50 m wide embankment rounding or a drainage device on the cuttings.

Our mission

  • Preliminary design studies;
  • Traffic and economic feasibility study;
  • Environmental impact assessment;
  • Execution studies and preparation of tender documents (DAO).