The objective of the Machakos Sustainable Water Supply and Sanitation Project is to review the design and supervise the construction of the Miwongoni Dam, a conventional water treatment plant, pipelines, water tanks and boreholes, and a wastewater treatment plant.

The rehabilitation works include the drinking water treatment plant on the Maruba Dam, 5 existing boreholes, force mains, water tanks, a wastewater pumping station and sewerage pipes.

Our mission

Component 1: Detailed review of design studies and assistance in procurement of works

  • Review of the technical studies
  • Review of the tender documents for design and construction
  • Assistance to the procurement of works

Component 2 : Construction control and supervision