Top
bg-detail-projet

CONTROL AND MONITORING OF DEVELOPMENT AND ASPIRING WORKS ON THE OUEDO-TORI BOSSITO ROAD (15.50 KM)

Benin

Project

  • The project concerns the asphalting work of a 15.5 km road with a lateritic gravel foundation layer, a lateritic gravel base layer treated with cement and a 5 cm bituminous concrete coating.

Our mission

  • Work control and supervision