Top

CONSTRUCTION OF THE GAFSA HIGHER INSTITUTE OF ARTS AND CRAFTS

Tunisia

Project

The project is located in the Gafsa university campus. The establishment has a capacity of 800 students and a total surface area of ​​5,650 m², a ground floor with partial floor. It includes the following components: 

  • An administration bringing together the offices and meeting rooms of management and the general secretariat; 
  • An educational unit bringing together the offices and the teachers' room; 
  • A common teaching unit bringing together a lecture hall with 100 seats, tutorial rooms with 30 seats each and labs; 
  • A specialized teaching unit bringing together the premises of the Music and Design departments; 
  • A library bringing together reading rooms for students and teachers and a periodical room; 
  • A socio-cultural block bringing together entertainment clubs and refreshment bars; 
  • A block for general services and technical premises including a store, a depot, a maintenance workshop and the boiler room, booster and transformer premises; 
  • Two staff accommodations and a visitor studio

Our mission

  • Mission S0 : Etudes de l’Avant-projet détaillé et établissement du dossier financier des lots spéciaux : Electricité, Téléphonie et câblage informatiques, Elévateurs, Fluides, Sécurité incendie et VRD. 
  • Mission S1 : Etudes et établissement des dossiers d’appel d’offres des lots spéciaux : Electricité, Téléphonie et câblage informatiques, Elévateurs, Fluides, Sécurité incendie et VRD 
  • Mission E1 : Etude de l'exécution du projet du lot Structure 
  • Mission E2 : Etablissement d'un avant-métré détaillé 
  • Mission S2 : Contrôle périodique des travaux des lots techniques spécialisés cités ci-dessus. 
  • Mission S3 : Direction des travaux des lots techniques spécialisés cités ci-dessus.