Top
bg-detail-projet

ABIDJAN-LAGOS ROAD CORRIDOR - LOT 3 : TOGO (NOÉPÉ - AGOMÉGLOZOU) - BENIN (ATHIÉMÉ (PONT D'AGOMEY GLOZOUN) - COTONOU-SÈMÈ -KRAKÉ) - NIGERIA (SEME- BADAGRY - LAGOS)

Togo

Project

Lot 3 of the Abidjan-Lagos motorway corridor crosses the following three countries over a total length of 300 km: 

  • Togo: from the Ghana/Togo border (Noépé) to the Togo/Benin border (Athiémé): search for a new route (90 km) including the construction of 32 restorations and 5 interchanges. 
  • Benin: from the Togo/Benin border (Athiémé) to the Benin/Nigeria border (Sémé Kraké): search for a new layout and existing ways (120 km) including the construction of 75 restorations and 11 interchanges. 
  • Nigeria: from the Benin/Nigeria border (Sémé Kraké) to Lagos: existing roads (80 km) including the construction of 75 restorations and 12 interchanges. 

The layout of the transit motorway includes a search for a new route on approximately 70% of the length (cross-section varying from 2x2 lanes to 2x3 lanes depending on the traffic per section) and an upgrading of existing roads to 2x3 lanes on approximately 30 % of the length by providing side lanes for local traffic. The coating is Bituminous Concrete.

Our mission

  • Phase 1: Harmonization of highway design standards and confirmation of the technical offer 
  • Phase 2: Feasibility study and preliminary synthesis 
  • Phase 3: Detailed technical studies with preparation of technical specifications. 
  • Phase 4: Financing strategies, construction and management study with the preparation of tender documents to establish operational planning for the construction of the project.