Projet
The project concerns the extension of the Apron and related taxiways:
- parking position for wide-body airplanes (NOSE IN Station)
- six parking positions B 737-800
Length = 250m; Depth = 85m (20 000m²)
Upgrading the taxiway alpha for the reference aircraft B737-800 - two parking positions B747-400
Length = 230m; Depth = 112m (25 760 m²)
Construction of a new taxiway with the width of 23m for the reference aircraft B747-400 aircraft (asphalt concrete pavement)
- six parking positions B 737-800
- General Aviation Apron
- The construction of the aviation parking: 160m x 33.5m (5360 m²)
- The construction of a taxiway to threshold 05 of 10.5m width in asphalt concrete
- Miscellaneous facilities
Notre mission
- Assistance to the Contracting Authority for the control and supervision of the studies and works.