REHABILITATION/RECONSTRUCTION OF LOT 3 (SECTION AIOUN- OUEINAT ZBIL, OUEINAT ZBIL - TIMBEDRA AND TIMBEDRA - NEMA)

Mauritania

Project

The Government of the Islamic Republic of Mauritania has launched a major Rehabilitation/Reconstruction project of sections of the national road network with a length of approximately 660 km divided into seven lots, including the following lot object of the mission entrusted to the consultant: lot 3 (Section Aioun- Oueinat Zbil, Oueinat Zbil - Timbedra and Timbedra - Néma) 

The works contract is subdivided into three lots (total linear of 270km): 

  • Lot No. 3.4: Aioun-Oueinat Zbil over a 90 km route 
  • Lot No. 3 .5: Oueinat Zbil-Timbédra over a length of 80 km 
  • Lot No. 3.6: Timbedra-Nema over a 100 km route

Our mission

  • General supervision of works and the execution of the works contracts of the Companies. 
  • Technical control and supervision of works. 
  • Financial monitoring of the execution of the works. 
  • Drafting periodic reports ; 
  • Assistance in receiving works.