Project
The Government of the Islamic Republic of Mauritania has launched a major Rehabilitation/Reconstruction project of sections of the national road network with a length of approximately 660 km divided into seven lots, including the following lot object of the mission entrusted to the consultant: lot 3 (Section Aioun- Oueinat Zbil, Oueinat Zbil - Timbedra and Timbedra - Néma)
The works contract is subdivided into three lots (total linear of 270km):
- Lot No. 3.4: Aioun-Oueinat Zbil over a 90 km route
- Lot No. 3 .5: Oueinat Zbil-Timbédra over a length of 80 km
- Lot No. 3.6: Timbedra-Nema over a 100 km route
Our mission
- General supervision of works and the execution of the works contracts of the Companies.
- Technical control and supervision of works.
- Financial monitoring of the execution of the works.
- Drafting periodic reports ;
- Assistance in receiving works.