The project consists of the modernisation, extension and upgrading of the MODIBO KEITA International Airport in Senou-BAMAKO.

The works concern :

  • the 15,000m² passenger terminal,
  • the water supply system for which the water tower connection is not made,
  • The 10 km medium voltage power supply network was fully completed, but some of the equipment had to be removed and stored on the premises of « l’Energie du Mali »,
  • the wastewater treatment system, where the structural work has been completed and the equipment partially delivered,
  • the international waste treatment system, where the building is almost complete and the equipment has been delivered but not installed,
  • the rainwater drainage system with partially completed drainage channels,
  • access roads, car parks and landscaped areas for which nothing has been done.

Notre mission

The Technical Assistance services are as follows:

  • The provision of a Project Management Professional (PMP) to the PMU
  • The provision of an Electrical/Electronic/IT Network Engineer to the PMU