Projet
The project concerns the construction of the Lot 4 OUED EL KHATT - TIDJIKJA, (91 km), section of the Atar -Tidjikja road (375 km). This road is part of a voluntarist policy of opening up the cities of the center and the north of the countries. Among the numerous benefits of this project, a harmonious development of the region crossed by the road, the development of the oasis and tourism potentialities within the project area, as well as a national and regional integration.
The works include:
- the construction of a 91 km long, 10 m wide with 2 lanes with a wearing course in bituminous concrete
- the construction of 43 hydraulic structures (submersible slabs or single / multiple culverts)
- the development of a junction at the end of the project in Tidjikja as well as 1300ml of urban roads crossing the town of Rachid
- protection of the roads against sand dunes through the stabilization of 50 ha of dunes.
Notre mission
-
Control and supervision of works.